Discover the largest library of Innovation & Transformation tools on the Internet!

The UNITE Innovation & Transformation Tools & Models

Over 50 tools and models to help you radically innovate and transform your organization without reading 50 books (and still getting nowhere!). Download now and hit the ground running!

Three UNITE models
EssentialPopular
The UNITE Business Model Canvas

Business Model

The UNITE Business Model Canvas

A product is only as good as the Business Model (BM) that supports it, and creating an innovative product requires an equally innovative BM.

8,814downloadsDiscover

EssentialPopular
The UNITE Jobs-to-be-Done Statement & Map

Customer needs / JTBD

The UNITE Jobs-to-be-Done Statement & Map

The Jobs-to-be-Done Statement and Map put the job your customer is hiring your product for at the centre of the work …

5,674downloadsDiscover

EssentialPopular
The UNITE Value Proposition Canvas

Value Proposition

The UNITE Value Proposition Canvas

The Value Proposition Canvas provides a framework that centers your customers. It supports understanding the problem your customer is truly trying to solve so that…

4,599downloadsDiscover

Essential
The UNITE Business Capability Map

The UNITE Business Capability Map

Our Business Capability Map summarizes the capabilities of your firm visually in order to help you think about which strengths and assets to leverage for both innovation initiatives as well as digital transformations.

4,326downloadsDiscover

EssentialPopular
The UNITE Strategy-Execution Framework

Strategy

The UNITE Strategy-Execution Framework

This ground-breaking framework helps you understand where to innovate and where to cut costs.

3,990downloadsDiscover

Popular
The UNITE Business Model Innovation Patterns

Business Model

The UNITE Business Model Innovation Patterns

The UNITE Business Model Innovation Patterns summarize 95% of all business model innovations. It is a wealth of approaches ...

3,510downloadsDiscover

The 8-step Process for Leading Change

The 8-step Process for Leading Change

Once you’ve used the Horizon 2 Digital Transformation process to make a step-change to your Business, you need to bring this innovation back into your core H1 business. This is where many transformation efforts fail. Follow the well-established 8-Step Process to successfully implement your innovation in the core organization.

3,320downloadsDiscover

Essential
The UNITE Environment Canvas

Understanding Context

The UNITE Environment Canvas

You don’t create Value Propositions or Business Models in a vacuum. This critical canvas helps you understand the larger ...

3,183downloadsDiscover

Essential
The UNITE Innovation & Transformation Models – The 4 waves of Industrial Revolution

The UNITE Innovation & Transformation Models – The 4 waves of Industrial Revolution

This ground-breaking model outlines the four waves of industrial and cultural revolution that human civilization has undergone over its history, breaking down the most critical factors for each period.

2,752downloadsDiscover

Essential
The UNITE Culture Canvas

Transformation Approach

The UNITE Culture Canvas

The UNITE Culture Canvas summarizes the most important factors that contribute to an organization’s culture. Its simple ...

2,741downloadsDiscover

Essential
The UNITE Innovation Approach (H3)

Innovation Approach

The UNITE Innovation Approach (H3)

The UNITE Innovation Approach covers the full innovation process end-to-end. It takes you through the entire lifecycle of an innovation ...

2,712downloadsDiscover

Essential
The UNITE Operating Model Canvas

Transformation Approach

The UNITE Operating Model Canvas

The UNITE Operating Model Canvas allows you to design your Operating Model purposefully, thinking about how each piece will support ...

2,480downloadsDiscover

The UNITE Value Disciplines

Strategy

The UNITE Value Disciplines

The Value Disciplines helps you and your team think about what quality your organization ultimately wants to stand for ...

2,368downloadsDiscover

Essential
The UNITE approach to Portfolio Allocation across the 3 Horizons

The UNITE approach to Portfolio Allocation across the 3 Horizons

Portfolio allocation is the most important long-term decision to generate results. The UNITE approach to portfolio allocation gives you a straightforward best practice for allocating your resources across the 3 Horizons of Growth.

1,996downloadsDiscover

The UNITE Pirate Metrics Funnel (AAARRR)

The UNITE Pirate Metrics Funnel (AAARRR)

The Pirate Funnel allows you to easily identify bottlenecks in your customer acquisition and retention process to help you reach your goals as you build and scale.

1,909downloadsDiscover

Essential
The UNITE Horizons of Growth

The UNITE Horizons of Growth

The UNITE Horizons of Growth are a breakthrough model that allows organizations to understand the three levels on which growth happens. Uniquely, this model demonstrates not only the “what,” but also the “how” and “where.”

1,797downloadsDiscover

Essential
The UNITE Business Intentions

The UNITE Business Intentions

This tool helps you define your Business Intention, the critical strategic objectives that will orient your entire innovation project. Nailing your business intentions is critical – else, you will be missing that guiding North Star.

1,739downloadsDiscover

The UNITE Exponential Growth Canvas

Business Model

The UNITE Exponential Growth Canvas

The UNITE Exponential Growth Canvas allows you to accelerate or even create exponential growth by including a unique set ...

1,599downloadsDiscover

The Jobs-to-be-Done Job Journey Navigator

The Jobs-to-be-Done Job Journey Navigator

The Job Journey Navigator allows you to instantly understand the gaps between the importance of a customer’s job and their current satisfaction with the available solutions. This analysis will enable you to identify your innovation opportunities.

1,544downloadsDiscover

Essential
The UNITE building blocks of digitalization

The UNITE building blocks of digitalization

The model helps you gain a complete understanding of the holistic and integrated nature of innovation and transformation initiatives.

1,515downloadsDiscover

SWOT / TOWS

SWOT / TOWS

Different arrangements for the same words – Strengths, Weaknesses, Opportunities, Threats – the SWOT/TOWS analysis framework explores internal and external forces that influence your business.

1,429downloadsDiscover

The UNITE PS + MVP Scorecard

Innovation Approach

The UNITE PS + MVP Scorecard

These scorecards allow you to rank your solutions concepts and MVPs at the end of Stages 2 and 3 against the most important criteria ...

1,413downloadsDiscover

The UNITE Jobs to be Done Customer Promise Canvas

The UNITE Jobs to be Done Customer Promise Canvas

The Customer Promise Canvas allows you to spin your most significant innovation opportunities into initial solutions and rank these. Further, we test the identified solutions against your business capabilities and the customer’s needs.

1,399downloadsDiscover

The UNITE Strategic Options Matrix

The UNITE Strategic Options Matrix

The UNITE Strategic Options Matrix allows us to identify and assess the Strategic Options of a firm. How are we going to adapt to changing conditions, what should be our next strategic moves, what approach should we take? This tool will help your team think through your options.

1,396downloadsDiscover

Essential
Assessment of Strategic Moves

Strategy

Assessment of Strategic Moves

The Assessment of Strategic Moves shows us that risks increase with additional steps away from the current economic core ...

1,367downloadsDiscover

The UNITE Innovation Team Structure

The UNITE Innovation Team Structure

The UNITE Innovation Team Structure helps you understand the default team structure and roles you need on an innovation team. Further, you can use the tool as a canvas to design your own team structure and roles.

1,359downloadsDiscover

The UNITE Paradigm Shift in Organization & Leadership

The UNITE Paradigm Shift in Organization & Leadership

This important model helps you understand the paradigm shift in organization and leadership that needs to happen in order to keep up with accelerating technological change.

1,356downloadsDiscover

9 Box Talent Review Matrix

9 Box Talent Review Matrix

The 9 Box Talent Review Matrix is a human resources management tool that evaluates and assesses an individual’s potential and current performance. It involves plotting an employee’s current job performance against their potential for future growth and advancement within the organization. By using the Matrix, managers can make individualized development programs.

1,267downloadsDiscover

The UNITE perspectives on Strategy – a framework for strategic thinking

The UNITE perspectives on Strategy – a framework for strategic thinking

This critical model will help you gain a holistic perspective on strategy and allow you to guide your thinking by focusing on the 4 central questions of strategic design.

1,228downloadsDiscover

THE UNITE definition of Search Fields & Opportunity Spaces

THE UNITE definition of Search Fields & Opportunity Spaces

The Search Field and Opportunity Space frame your entire innovation initiative(s) up to portfolio level. They fundamentally help you define the general problem you want to solve and help you shape the areas where you could offer viable solutions.

1,198downloadsDiscover

The UNITE Business Model Scorecard

Business Model

The UNITE Business Model Scorecard

The scorecard gives you the most critical questions you need to challenge your Business Model. It will help you gauge ...

1,111downloadsDiscover

The UNITE Elevator Pitch Template

The UNITE Elevator Pitch Template

The elevator pitch is the key marketing summary of your offering and Value Proposition. With the help of the UNITE Elevator Pitch Template, you can craft a short but compelling description that will serve as the basis of your positioning.

1,098downloadsDiscover

UNITE Key Metrics for Innovation

UNITE Key Metrics for Innovation

The key metrics for growth represent the key metrics you will need to focus on to ensure that you can get your innovation off the ground.

1,051downloadsDiscover

The UNITE ambidextrous org-chart

The UNITE ambidextrous org-chart

This ambidextrous org-chart demonstrates how an organization might organize around the 3 Horizons of Growth, catering to both the existing core organization, but also focusing on innovation and transformation.

951downloadsDiscover

Porter’s Value Chain Model

Porter’s Value Chain Model

Porter’s Value Chain Model is a framework that helps analyze a company’s internal processes and activities to identify areas where value can be added and costs can be reduced. As a tool for business strategy, it helps us understand the sources of value creation in a company and how that company can improve its competitiveness. The model separates primary and support activities that a company performs in order to deliver a product or service to its customers.

932downloadsDiscover

The UNITE Innovation & Transformation Models – Examples of exponentially accelerating change

The UNITE Innovation & Transformation Models – Examples of exponentially accelerating change

This ambidextrous org-chart demonstrates how an organization might organize around the 3 Horizons of Growth, catering to both the existing core organization, but also focusing on innovation and transformation.

915downloadsDiscover

The UNITE Approach to Testing

The UNITE Approach to Testing

The UNITE approach to testing lays out the best ways to test your innovation in each of the stages of the UNITE innovation process, enabling you to choose the right test to move your innovation forward.

874downloadsDiscover

The UNITE Visible and Invisible Dimension

The UNITE Visible and Invisible Dimension

One of the values of the Mindset Spectrum is that it is a tool that helps us see the big picture and all of the minute details of our organization. It’s like a telescope, and a microscope rolled into one. So here we use it to outline how different mindsets influence specific aspects of your organization, both the obvious and the not-so-obvious ones.

818downloadsDiscover

Essential
The UNITE Cultural layers model

The UNITE Cultural layers model

The UNITE Cultural Layers Model summarizes all the layers from purpose in the center to business outcomes and bottom-line results. Each layer builds on the previous one, and ultimately all are aligned with purpose. Nicely, we can thus connect the deep purpose and the softer aspects of culture to the more “hard” and measurable business outcomes and understand how they connect.

813downloadsDiscover

The Growth-Hacking process

The Growth-Hacking process

The Growth-Hacking process gives you a clear template and approach how to plan and execute the growth of your business.

762downloadsDiscover

Balanced Scorecard

Balanced Scorecard

By targetting four specific Viewpoints in its grid, the Balanced Scorecard analyzes your current operations and the goals you have for each.

704downloadsDiscover

Adkar Model

Adkar Model

The ADKAR model is a framework for change management that helps organizations understand and lead through a larger change initiative. ADKAR is an acronym for the five key elements of successful change: Awareness, Desire, Knowledge, Ability, and Reinforcement.

696downloadsDiscover

The UNITE Aligning Teams

The UNITE Aligning Teams

The UNITE Team Alignment model visually demonstrates different ways of creating alignment in a team and their implications.

681downloadsDiscover

The UNITE Principles of successful teams

The UNITE Principles of successful teams

The UNITE Principles for successful Innovation Teams builds on Google’s Project Aristotle, which outlines the main things a team needs to thrive. We have set this work in context, tied the team’s work to the other layers of the culture model, and demonstrated how the principles align with the Mindset Spectrum.

621downloadsDiscover

The UNITE Paradigm Shift in Leadership

The UNITE Paradigm Shift in Leadership

As organizational culture shifts from early to later stages of the Mindset Spectrum, principles of leadership change as well. The UNITE Paradigm Shift in Organization and Leadership outlines the critical factors of green-teal leadership and how they differ from earlier models.

620downloadsDiscover

Value Creation

Value Creation

The UNITE value creation framework outlines how a company or organization generates value for its customers, stakeholders, and shareholders. It involves identifying the key activities, resources, and capabilities that contribute to creating value, as well as understanding the needs and preferences of the target audience.

606downloadsDiscover

The UNITE Overview of evolutionary developments

The UNITE Overview of evolutionary developments

The Mindset Spectrum is the basis of our model of cultural transformation. It shows us how an individual’s mindset evolves as they grow and how humankind’s mindset has also evolved over the course of history. An innovation culture requires a green/teal mindset. This model is the key to understanding how to get there.

606downloadsDiscover

The UNITE Perspectives-on-organizations

The UNITE Perspectives-on-organizations

The visible aspects of our companies that we think of as “culture,” such as processes, structures, behaviors and rituals arise from our personal and collective thoughts, feelings, perceptions and values. If we truly want to revolutionize our culture we must dig deeper.

580downloadsDiscover

The UNITE Innovation & Transformation Models – Average life expectancy of S&P 500 companies

The UNITE Innovation & Transformation Models – Average life expectancy of S&P 500 companies

A visual depiction of the decreasing lifes expectancy of companies based on data from Standard and Poor’s.

580downloadsDiscover

Stakeholder Map

Stakeholder Map

The UNITE Stakeholder maps help you understand the different perspectives and needs of stakeholders, and to develop strategies for engaging and managing them effectively.

568downloadsDiscover

Lewin’s Change Model

Lewin’s Change Model

Lewin’s Change Model describes a three-phase process for implementing change – Unfreeze, Change, and Refreeze – that helps organizations implement necessary changes despite our usual reluctance to abandon the status quo.

541downloadsDiscover

The UNITE Evolutionary Drivers of Change

The UNITE Evolutionary Drivers of Change

It may be cliched to say that change comes from within, but it is true in terms of changes in culture. It is almost always the case that change arises from personal growth. This is why we need to foster such personal evolution in our organizations.

538downloadsDiscover

Approach to Value Stream Mapping

Approach to Value Stream Mapping

Design your core value creation processes in an ideal way. Connect the dots end to end from onstage action to backstage to supporting processes, IT and your internal setup. The ideal basis to develop an agile organization.

519downloadsDiscover

Project Design Canvas

Project Design Canvas

Defining a project accurately is critical to its success. The Project Design Canvas is a visual tool that ensures you are addressing the most important components of a project and that you do so consistently.

498downloadsDiscover

Lean Business Model Canvas

Lean Business Model Canvas

The Lean Business Model Canvas is a visual tool used to simplify and analyze a business model. Users focus on creating a minimum viable product to validate the business idea with customers as quickly and efficiently as possible. Based on the Business Model Canvas framework, the Lean Canvas emphasizes rapid experimentation and iteration.

496downloadsDiscover

The UNITE Hiring Download Package

The UNITE Hiring Download Package

People are the heart of any organization. In an innovation culture, you need people with a green-teal mindset who can adapt flexibly to changing situations. Therefore, hiring is perhaps the most crucial business function. As such, it should never be outsourced or delegated. So get the right people on your team. We will show you how.

492downloadsDiscover

RASCI Matrix

RASCI Matrix

The RASCI Matrix is a tool used to clearly define roles and responsibilities within a team or organization. It is used to identify who is responsible for specific tasks or decisions, who is accountable for the overall success or failure of a project or initiative, and who needs to be consulted or informed throughout the process.

477downloadsDiscover

McKinsey 7s

McKinsey 7s

The McKinsey 7-S Framework is a management tool that helps organizations align their strategy, structure, systems, shared values, skills, staff, and style to achieve their goals, based on the idea that these seven elements are interconnected and mutually reinforcing.

475downloadsDiscover

PESTLE Analysis

PESTLE Analysis

The PESTLE Analysis is a popular framework used by strategists to explore the marketplace and environment in which they currently operate or plan on entering in the future.

434downloadsDiscover

BCG Matrix

BCG Matrix

The Growth Share Matrix (also known as BCG Matrix after the Consulting firm Boston Consulting), is a tool for portfolio management based upon a businesses’ growth prospects and it’s existing and potential market share.

385downloadsDiscover

UNITE Navigator

UNITE Navigator

We needed an executive overview of innovation and digital transformation as well as the entire story around it. The UNITE Navigator does just that: It provides an overview of all areas related to innovation and transformation. It serves as access point to the UNITE models – the largest library of innovation and transformation models on the Internet. And it covers all areas of digital strategy, innovation, transformation, and any related fields.

370downloadsDiscover

Circular Organizational Structure

Circular Organizational Structure

Defining a project accurately is critical to its success. The Project Design Canvas is a visual tool that ensures you are addressing the most important components of a project and that you do so consistently.

364downloadsDiscover

Ansoff Matrix

Ansoff Matrix

The Ansoff Growth Matrix is a strategic planning tool to define a product and market growth strategy on the highest level. It provides a framework for analyzing a company’s potential for growth by considering the interactions between existing products, new products, existing markets, and new markets.

359downloadsDiscover

VRIO Framework

VRIO Framework

The VRIO is a tool built around a set of questions designed to uncover your business’s sustainable competitive advantage. These are unique to your way of delivering value and unlikely to be copied by competitors in the near future. VRIO stands for Value, Rarity, Imitability, and Organization.

333downloadsDiscover

Five Stars Model

Five Stars Model

Galbraith’s Five Stars Model for Organizational Design is a framework for designing and analyzing organizations. It describes the key elements required to create an effective organizational structure. The Five Stars are: 1. Strategy & Policy 2. Structure 3. Systems 4. Shared Values 5. Style

320downloadsDiscover

Empathy Map

Empathy Map

The Empathy Map model is a tool used in design thinking to help businesses understand the needs, desires, and behaviors of their target customers. The Empathy Map model is a useful tool for businesses looking to improve their customer experience, develop new products, or expand into new markets.

305downloadsDiscover

Company Board

Company Board

The Company Board enables all colleagues to contribute to an agile and self-learning organization. The company board thus helps the organization to continuously adapt to the market as quickly and sustainably as possible.

229downloadsDiscover

Scaling the circular organization

Scaling the circular organization

The Approach to Scaling Circular Organizations shows ways to create a network of organization or on how to setup hybrid organizations.

209downloadsDiscover

Circle Constitution

Circle Constitution

The UNITE Circle Constitution Template allows a circle to establish their work agreements. It helps you efficiently define what each circle is all about.

207downloadsDiscover

Collegial Learning

Collegial Learning

The UNITE Approach to Collegial Learning enables all colleagues of an organization to acquire new skills in a fast and efficient way and to do so on-the-job.

191downloadsDiscover

The UNITE Evolutionary Drivers of Change-de

The UNITE Evolutionary Drivers of Change-de

0downloadsDiscover

Each account includes one complimentary model download per month.

Want unlimited access to 120+ proven strategy, innovation, and transformation frameworks? Talk to us about UNITE for your organization →

How to Create Innovation

The origin

The Origin of this Model: “How to Create Innovation”

How to Create Innovation is a practical, comprehensive, OpenSource guide for successful corporate innovation.

The UNITE initiative and movement, spearheaded by Stefan F. Dieffenbacher and Caroline Hüttinger and supported by a diverse team of industry leaders and innovation researchers, aims to spark a revolution in global innovation and transformation.

How to CREATE INNOVATION is a workbook for students, innovators, designers, and government and corporate leaders who appreciate and are curious about emerging technologies and the accelerating pace of innovation. It challenges the status quo and supports the development of the mindset, beliefs and strategies necessary for the next stage of business evolution. Leverage the UNITE innovation framework to conceptualize and build the future of your business.

Stefan F. Dieffenbacher

The people behind the models

Benefit from Digital Leaderships’ experience

Digital Leadership is a strategy-execution firm built on strong and innovative values. We support our customers in strategizing, building and securing their future through the creation of fully digitally enabled, and extraordinarily successful, products and businesses. Our agile, lean, fast-track business setup, coupled with access to an extensive pool of highly specialized and trusted resources (customized for each customer’s journey), allows for ideating and building in an effective and meaningful way.

Shared goals are the cornerstone of our customer approach. To date, our team has successfully led 74 projects with numerous global players across all industry sectors, ranging from $50,000 projects to $100 million ones. But helping our customers’ build their futures is not enough. We are committed to changing the world through the sharing of powerful innovation and transformation practices. Join the UNITE movement and help us start an innovation revolution.

We build digital winners. It’s what we are made for. Let’s create winning digital businesses – together. And, at the same time, let’s create a world worth living in.

Stefan F. DieffenbacherFounder & Managing Director of Digital Leadership

The Strategy-to-Outcome Platform

Talk to us.

The first meeting is a working session, not a pitch.

The calendar is provided by Calendly. Loading it gives Calendly your IP address, sets cookies, and shares the details you enter. More on this

Write to us instead